Friday, July 11th, 2003....

The shed is built!!!! The guys from the Shed Shop came this morning at 9:00 a.m. and left around 3:30 p.m. Actually, it didn't even take them that long to build the shed --- they had to take off for about an hour or so to get some forgotten materials. All the framing 2-by-4's are already cut to length, so all they have to do is put it all together!!! They use nail guns so it goes even faster. I was amazed at how quickly and efficiently the shed went up.

The shed rests on pressure-treated 4-by-4's; on top of that are the 2-by-4 floor joists and the plywood floor. The framing goes up, windows and doors go in, and the composition hardboard siding goes up. The roofing is plywood, then felt paper, then 30-year dimensioned asphalt shingles. I have three double-paned windows, a full-size door with the upper half glass panes. The entire shed is really well-built and solid!

My plans are to paint the exterior and have an electrician come in Monday to run a subpanel to the shed and put in all the outlets, etc. Then I will put in insulation and drywall, and finally paint the interior. Oh, yeah...and some kind of flooring...

 

   

 Previous Page

 Back to the Mat's Place Home Page

 Next Page

 

GO TO....

 Intro Page

Living Room / Kitchen

 Workshed

 Bedroom

 Office